Current through Register No. 45, November 7, 2024
Section Env-A 619.03 - PSD Program Requirements(a) In furtherance of RSA 125-C:11 and except as provided in (b) and (d), below, the provisions of 40 CFR § 52.21(a)(2), (b) through (e), (h) through (k)(1), (l) through (p), (r), (v), (w), (aa), and (bb), and 40 CFR 51.165(b), July 1, 2016 edition, shall apply for the purpose of implementing a PSD permit program that meets the requirements of Title I of the Act.(b) For the purposes of this part, the word "department" shall replace the word "administrator" in the paragraphs of 40 CFR § 52.21 referenced in (a), above, except in the following paragraphs: (2) Paragraph (b)(37)(i);(4) Paragraph (b)(48)(ii)(c);(5) Paragraph (b)(50)(i);(7) Paragraph (l)(2); and(c) For the purpose of this part, the definitions contained in 40 CFR § 52.21(b), shall apply with the following revisions:(1) For the purposes of calculating baseline actual emissions pursuant to 40 CFR § 52.21(b)(48): a. The same consecutive 24-month period shall be used for all pollutants;b. The 24-month period shall be selected from the 5-year period immediately preceding the date the owner or operator begins actual construction of the project; andc. The department shall allow the use of a different time period up to 10 years immediately preceding the date the owner or operator begins actual construction of the project or allow use of a different consecutive 24-month period for different pollutants upon demonstration by the applicant that it is more representative of normal source operations.(d) For the purposes of this part, the reference to Appendix W in 40 CFR 52.21(l) shall refer to the July 1, 2019 edition.N.H. Admin. Code § Env-A 619.03
#7879, eff 4-26-03 (formerly Env-A 623.03); ss by #9840, eff 12-21-10; ss by #10175, eff 9-1-12; ss by #12011, eff 10-22-16
Amended by Volume XXXVI Number 45, Filed November 10, 2016, Proposed by #12011, Effective 10/22/2016, Expires 10/22/2026.Amended by Volume XLI Number 19, Filed May 13, 2021, Proposed by #13191 , Effective 4/21/2021, Expires 4/21/2031.