N.H. Admin. Code § Env-A 618.06

Current through Register No. 50, December 12, 2024
Section Env-A 618.06 - Permit Application Requirements
(a) Nonattainment NSR and plantwide applicability limit (PAL) permit applications required under this part shall be filed in accordance with the procedures set forth in Env-A 607.03.
(b) An application for a nonattainment NSR permit shall contain the following items:
(1) A control technology evaluation to demonstrate that any new major stationary source or major modification will meet the LAER for all new or modified emission units;
(2) A documented plan to obtain creditable emission reduction offsets in accordance with Env-A 618.07;
(3) A demonstration showing that all major stationary sources in New Hampshire, which are owned or operated by such person or any entity controlling, controlled by, or under common control with such person, are subject to emission limitations and are in compliance, or are on a schedule for compliance which is federally enforceable or contained in a court decree, with all applicable emission limitations and standards under the Act; and
(4) A demonstration showing that the benefits of the proposed source significantly outweigh the environmental and social costs imposed as a result of its location, construction, or modification by providing an analysis of alternative sites, sizes, production processes, and environmental control techniques in accordance with section 173(a)(5) of the Act.
(c) An application for a permit to establish a PAL shall contain the information required pursuant to 40 CFR §51.165 (f)(3).

N.H. Admin. Code § Env-A 618.06

#7879, eff 4-26-03 (formerly Env-A 622.06); amd by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12 (from Env-A 618.03)