N.H. Admin. Code § Env-A 618.04

Current through Register No. 50, December 12, 2024
Section Env-A 618.04 - Owner or Operator Obligations
(a) Except as provided in (b) below, the owner or operator of any new major stationary source or major modification subject to this part shall:
(1) Comply with the lowest achievable emission rate (LAER);
(2) Obtain offsets for the increase in emissions for the project in accordance with Env-A 618.07; and
(3) Obtain a nonattainment NSR permit before beginning actual construction of the project.
(b) Approval of an application to comply with NSR, as specified in Env-A 618.06, or establish a PAL, as specified in Env-A 618.09, shall not relieve the owner or operator of responsibility to otherwise comply with these rules or local, state, or federal law.
(c) The owner or operator of an existing major source with a plantwide applicability limit (PAL) shall comply with the provisions of its PAL.
(d) The owner or operator of a source shall make the information specified in 40 CFR 51.165(a)(6) available for review upon a request for inspection by the department or the general public as specified in 40 CFR 70.4(b)(3) (viii).

N.H. Admin. Code § Env-A 618.04

#7879, eff 4-26-03 (formerly Env-A 622.05(a)-(c)); ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12

Amended by Volume XXXVI Number 45, Filed November 10, 2016, Proposed by #12011, Effective 10/22/2016, Expires 10/22/2026.