N.H. Admin. Code § Env-A 607.09

Current through Register No. 50, December 12, 2024
Section Env-A 607.09 - Permit Reissuance
(a) The owner or operator to whom a temporary permit was issued may request a reissuance of the temporary permit for a period not to exceed one year, provided that at least one of the following is met:
(1) Actual construction has been completed by the expiration date, but any required compliance testing has not been completed;
(2) Actual construction has commenced by the expiration date but has not been completed;
(3) Actual construction has not commenced, but the owner or operator provides a copy of at least one binding agreement or contractual obligation which cannot be canceled or modified without substantial loss to the owner or operator;
(4) The owner or operator is in the process of obtaining a permit or other authorization required for the project from another governmental entity; or
(5) The owner or operator is involved in litigation where a decision regarding a permit or other authorization required for the project from another governmental entity has been issued and appealed.
(b) To obtain a reissuance, the owner or operator shall file a written request for a reissuance that specifies the basis for the request and includes a certification as specified in Env-A 605.04(c).

N.H. Admin. Code § Env-A 607.09

#6057-B, eff 6-30-95; ss by #7879, eff 4-26-03; ss by #9906, INTERIM, eff 4-26-11, EXPIRES: 10-24-11; ss by #10000, eff 10-1-11; ss by #10175, eff 9-1-12