N.H. Admin. Code § Env-A 4706.06

Current through Register No. 50, December 12, 2024
Section Env-A 4706.06 - Monitoring and Verification Requirements
(a) The project sponsor shall provide a monitoring and verification plan as part of the consistency application, which includes:
(1) An SF6 inventory management and auditing protocol; and
(2) A process for quality assurance and quality control of inventory data.
(b) The monitoring and verification report shall be certified by an independent verifier accredited pursuant to Env-A 4610.
(c) The annual monitoring and verification report required by Env-A 4711.02(b) shall include supporting material detailing the data and calculations used to determine SF6 emissions reductions.
(d) The project sponsor shall identify each facility managed by the entity from which or to which any SF6 gas is procured or disbursed.
(e) The project sponsor shall maintain an entity-wide log of all SF6 gas procurements and disbursals, which includes the following:
(1) The weight of each cylinder transported before shipment from the facility or facilities and the weight of each cylinder after return to the facility or facilities;
(2) A specific cylinder log for each cylinder that is used to fill equipment with SF6 or reclaim SF6 from equipment, which shall:
a. Be retained with the cylinder;
b. Indicate the location and specific identifying information of the equipment being filled, or from which SF6 is reclaimed, and the weight of the cylinder before and after this activity; and
c. Be returned with the cylinder to the facility when the activity is complete or the cylinder is empty; and
(3) A current entity-wide inventory of all SF6-containing operating equipment and all other SF6-related items, including cylinders, gas carts, and other storage containers used by the entity, which is certified by an independent verifier accredited pursuant to Env-A 4610.

N.H. Admin. Code § Env-A 4706.06

#9481, eff 5-23-09; ss by #10469, eff 1-1-14