Current through Register No. 45, November 7, 2024
Section Env-A 3308.05 - Independent Third-Party InspectionsA large MWC facility combusting PWR shall obtain PWR only from suppliers that contract with independent third parties to conduct inspections of their facilities that meet the following requirements:
(a) Inspections shall be unannounced;(b) An inspector shall: (1) Perform an onsite inspection of the supplier's operations that affect the production of PWR to determine whether processing complies with the requirements of 40 CFR 241.4(a)(5);(2) Collect a composite sample that consists of at least 8 discrete samples from PWR that is on site at the time of the inspection;(3) Analyze the composite sample in accordance with Env-A 3308.06 to determine whether the PWR meets the criteria specified in Env-A 3308.03;(4) Prepare a written inspection report containing the final results of the inspection and composite sample analysis; and(5) Within 45 days after completion of the inspection, provide the written inspection report to the large MWC facility combusting or proposing to combust PWR from the supplier.N.H. Admin. Code § Env-A 3308.05
Derived From Volume XXXVIII Number 41, Filed October 11, 2018, Proposed by #12628, Effective 9/27/2018, Expires 9/27/2028.