Current through Register No. 50, December 12, 2024
Section Env-A 3210.02 - Requirements for Installation, Certification, and Data AccountingThe owner or operator of each NOx budget source shall:
(a) Install all monitoring systems required under this part for monitoring NOx mass, including all systems required to monitor NOx emission rate, NOx concentration, heat input, and flow, in accordance with 40 CFR 75.72 and 75.74;(b) Install all monitoring systems for monitoring heat input for developing NOx allowance allocations, if required under Env-A 3210.07;(c) Successfully complete all certification tests required and meet all other provisions of this part and 40 CFR Part 75 applicable to the monitoring systems under paragraphs (a) and (b), above; and(d) Record and report data from the monitoring systems under paragraphs (a) and (b), above.N.H. Admin. Code § Env-A 3210.02
#6811, EXEMPT, eff 7-17-98; ss by #7077, eff 8-25-99; ss by #7229, eff 4-1-00; ss by #9022, eff 11-2-07
Amended by Volume XXXVI Number 01, Filed January 7, 2016, Proposed by #11001, Effective 1/1/2016, Expires 1/1/2026.