N.H. Admin. Code Env, Env-A, ch. Env-A 2900, app C

Current through Register No. 50, December 12, 2024
Appendix C - Env-A 2910.02 as effective May 13, 2003

Env-A 2910.02 Requirements for Installation, Certification, and Data Accounting. No later than 10 days after the effective date of this chapter, the owner or operator of each affected source shall:

(a) Install all monitoring systems required under this part for monitoring mass emissions, including all systems required to monitor emission rate, concentration, heat input, net electrical output, and flow, in accordance with 40 CFR 75;

(b) Successfully complete all certification tests required and meet all other provisions of this part and 40 CFR 75 applicable to the monitoring systems under paragraph (a), above; and

(c) Record and report data from the monitoring systems under paragraph (a), above.

N.H. Admin. Code Env, Env-A, ch. Env-A 2900, app C