Current through Register No. 45, November 7, 2024
Section Env-A 1805.11 - Specific Requirements for Enclosure of RACM When an O/O chooses to enclose RACM, the O/O shall:
(a) Notify and pay the fee in accordance with Env-A 1804.09(c)(1) or (2), as applicable;(b) Prior to enclosure, remove loose and hanging RACM in accordance with Env-A 1805;(c) Ensure that enclosures are airtight and of permanent construction, such that the area being enclosed is inaccessible;(d) Prior to commencing work, wet all RACM that has the potential to be disturbed during the installation of hangers, brackets, or other portions of the enclosure; and(e) Designate enclosures for RACM by signs, labels, color coding, or some other readily visible mechanism on the enclosure to warn individuals who may be required to disturb the enclosure.N.H. Admin. Code § Env-A 1805.11
(See Revision Note at chapter heading for Env-A 1800) #9298, eff 10-21-08
Amended by Volume XXXVII Number 19, Filed May 11, 2017, Proposed by #12172, Effective 5/5/2017, Expires 5/5/2027.