During asbestos abatement, each O/O of a facility where an asbestos abatement project is occurring shall retain the following documents on-site, in electronic or paper format, for the duration of the asbestos abatement project:
(a) A current copy of this chapter;(b) Copies of the decontamination procedures used for the decontamination enclosure system required by Env-A 1805.06 or any other procedures which have been established to prevent contamination of areas outside the work area;(c) Copies of procedures to be followed during medical or fire emergencies, including phone numbers of the nearest emergency facilities;(d) Copies of all licenses, certificates, and proof of current training held by all supervisors and workers engaged in the asbestos abatement project;(e) Records of all project-related air sampling results and a copy of the inspection report prepared by the asbestos inspector;(f) A copy of any written notification concerning the asbestos abatement project submitted to the department pursuant to Env-A 1804; and(g) The work plan for the asbestos abatement project.N.H. Admin. Code § Env-A 1803.02
(See Revision Note at chapter heading for Env-A 1800) #9298, eff 10-21-08
Amended by Volume XXXVII Number 19, Filed May 11, 2017, Proposed by #12172, Effective 5/5/2017, Expires 5/5/2027.