Failure to submit a quantitative report as required by Bea 306.01 for any previously funded project(s) shall result in denial of an application unless good cause for such failure exists. Good cause shall include, but not be limited to, circumstances beyond the control of the organization. Claims of good cause shall be made in writing to the commissioner.
N.H. Admin. Code § Bea 302.12