Current through Register No. 50, December 12, 2024
Section Agr 708.01 - Permission for Construction on or Alteration of Site(a) Construction of agricultural buildings or dwelling houses for the owner, operator, or employees of a farm situated on a site or alteration of a site shall require approval of the committee.(b) The owner of the site shall submit a request for approval for construction or alteration to the commissioner and a copy of such request to the governing body of the municipality in which the site is located which includes: (1) The name of the owner and the location of the site;(2) A description of the construction or alteration being proposed; and(3) A map of the site showing the location of the proposed construction or alteration.(c) Within 30 days of the receipt of a request for permission for construction on or alteration of the site the committee shall conduct a public hearing in accordance with RSA 541-A.(d) The committee shall decide, upon the evidence presented at the hearing, whether the request conforms to the provisions of the restriction and whether construction on or alteration of the site shall be approved.(e) Within 7 days of the hearing, the committee shall inform the owner and the governing body of the municipality in writing of its decision whether to grant the request.N.H. Admin. Code § Agr 708.01
#1601, eff 7/1/1980; ss by # 2237, eff 1/1/1983; ss by #2887, eff 10/22/1984; ss by #4098, eff 7/22/1986, EXPIRED: 7/22/1992; #7463, eff 3/21/2001, EXPIRED: 3/21/2009.Amended by Number 15, Filed April 11, 2024, Proposed by #13910, Effective 3/21/2024, Expires 3/21/2034 (see Revision Note at chapter heading for Agr 700).