Nev. Admin. Code § 704A.210
Current through December 31, 2024
Upon receipt by the utility of a proper application for the installation of an underground system of electric distribution, the utility and the applicant shall cooperate with each other so that no undue burden will be borne by either.
Nev. Admin. Code § 704A.210
NRS 703.025, 704.260, 704.280, 704A.300