"Alternative cost-recovery methodology" means a public utility's methodology for the recovery of gas infrastructure expansion costs that are not economically feasible pursuant to the public utility's rule for the extension of facilities.
Nev. Admin. Code § 704.9741
Section 1 of Senate Bill No. 151, chapter 59, Statutes of Nevada 2015, at page 251.