Nev. Admin. Code § 704.79981

Current through November 25, 2024
Section 704.79981 - Requirement to submit application
1. A person who seeks to merge with, acquire through a subsidiary or affiliate, or otherwise directly or indirectly obtain control of an energy utility doing business in this State or of an entity that holds a controlling interest in such an energy utility, must submit an application to the Commission pursuant to NRS 704.329 that complies with NAC 704.79971 to 704.79991, inclusive.
2. If any requirement set forth in NAC 704.79971 to 704.79991, inclusive, duplicates a requirement in a filing submitted by an applicant to a regulatory body other than the Commission, the applicant may satisfy the requirement set forth in NAC 704.79971 to 704.79991, inclusive, by providing a cross reference to the location of the duplicated requirement in the filing submitted to the other regulatory body.

Nev. Admin. Code § 704.79981

Added to NAC by Pub. Utilities Comm'n by R128-98, eff. 12-3-99

NRS 703.025, 704.210, 704.329