Section 704.8921 - Application for participation in system1. A portfolio energy system or efficiency measure or an owner of portfolio energy credits who wishes to participate in the system of portfolio energy credits established pursuant to NRS 704.7821 or 704.78213, as applicable, must apply to, and be approved by, the Commission to participate in the system.2. The application must include: (a) The legal name of the applicant and all other names under which the applicant is doing business in the United States.(b) The telephone number, mailing address and electronic mail address of the applicant.(c) A copy of each business license and certificate issued by this State or any local government of this State which authorizes the applicant to conduct business in this State.(d) The name, telephone number, address and electronic mail address of the designated representative, if the applicant is a renewable energy system.(e) A map indicating the location of the portfolio energy system or efficiency measure and an electrical one-line diagram indicating the system's interconnection points with the local distribution or transmission system and the location of all generation units, if applicable.(f) The type of portfolio energy system or efficiency measure.(g) The rating of the electrical capacity of the renewable energy system.(h) The date the portfolio energy system was placed into operation or efficiency measure was installed.(i) If the applicant is a provider of electric service, the date the applicant first used electricity generated or acquired from the renewable energy system to satisfy its portfolio standard.(j) The estimated yearly generation or savings of electricity by the portfolio energy system or efficiency measure in kilowatt-hours.(k) If the applicant is a portfolio energy system, the estimated yearly generation of electricity that will be used by the portfolio energy system for its basic operations. If the portfolio energy system generates electricity from geothermal energy, the estimated yearly generation that will be used by the portfolio energy system for the extraction and transportation of geothermal brine or used to pump and compress geothermal brine.(l) The location and type of metering used by the portfolio energy system or efficiency measure, including either the identification of primary metering and secondary metering at multiple sites or a measurement and verification plan.(m) If fossil fuel is used as an energy source to generate electricity, the percentage that fossil fuel bears to the total input of the renewable energy system. If the percentage of fossil fuel is more than 2 percent of the total input, as measured in British thermal units, a statement that indicates whether separate metering is practical.(n) Proof that the applicant is a portfolio energy system or efficiency measure or an owner of portfolio energy credits.(o) A signature page signed by an authorized agent of the portfolio energy system or efficiency measure which states that the portfolio energy system or efficiency measure consents to the jurisdiction of the Commission for the purposes of participating in the system of portfolio energy credits.3. If there is a change in any information contained in the application, the applicant shall notify the Commission and provide the revised information within 30 days after the change in the information occurs.Nev. Admin. Code § 704.8921
Added to NAC by Pub. Utilities Comm'n by R115-03, eff. 2-18-2004; A by R167-05, 2-23-2006; R198-09, 1-13-2011; A by R053-15, eff. 12/21/2015NRS 703.025, 704.210, 704.7821, 704.7828