Section 704.9492 - Rates for long-term avoided cost: Inclusion of certain information in resource plan; estimation; specification of proposed limits concerning availability1. A utility shall file, as part of its resource plan, the methodology for estimating the rates for long-term avoided cost of the utility, including the capacity and energy components. The rates for long-term avoided cost must be based upon the utility's preferred plan and be consistent with 18 C.F.R. § 292.304(a), (b), (c) and (e).2. The utility shall file, as part of its resource plan, the data from which avoided costs may be derived, as required by 18 C.F.R. § 292.302(b). The utility shall maintain for public inspection the data submitted pursuant to this subsection. In addition to the data filed with the resource plan pursuant to this subsection, the data from which long-term avoided costs may be derived must be filed with the Commission at least once every 2 years.3. In developing the estimated rates for long-term avoided cost, the proposed rates must not be applied to energy that is subject to the qualified energy recovery process as defined in NRS 704.7809.4. The utility shall specify its proposed limits concerning the availability of the rates for long-term avoided cost.5. The resource plan of the utility must include the analyses and calculations used to determine the proposed rates.6. The resource plan must include a description of the methodology that will be used to derive the rates for long-term avoided costs from the solicitation of proposals performed pursuant to subsection 5 of NAC 704.9496.Nev. Admin. Code § 704.9492
Added to NAC by Pub. Utilities Comm'n by R004-04, eff. 5-25-2004; A by R044-21A, eff. 11/15/2024