Section 704.9395 - Resource plan: Information on financial and economic characteristics of planned facilitiesA utility's resource plan must contain information on the financial and economic characteristics of planned facilities. The information must include:
1. The estimated costs of construction, including: (a) Annual flows of expenditures with allowance for money expended during construction; and(b) Annual flows of expenditures without allowance for money expended during construction;2. The estimated costs of operation, including: (a) Variable costs per kilowatt-hour, with expenses for fuel and other items indicated separately; and(b) Fixed costs per kilowatt-hour;3. Net environmental costs and net economic benefits to the State;4. The rates of escalation of cost, including: (c) Nonfuel operating costs;(d) Environmental costs; and(e) Fixed operating costs; and5. The average cost per kilowatt-hour at projected loads in current dollars for each year of the plan for each existing and planned facility.Nev. Admin. Code § 704.9395
Added to NAC by Pub. Service Comm'n, eff. 6-7-84; A 2-18-88; 3-27-92; A by Pub. Utilities Comm'n by R004-04, 5-25-2004NRS 703.025, 704.210, 704.741