The owner or operator of a qualifying facility or a facility which may become a qualifying facility shall submit the following information, without limitation, to the utility before negotiations relating to the contract for the purchase of that energy begin:
1. His or her name and address and the location of the facility;2. A brief description of the facility, including a statement whether it is a small power production facility or a cogeneration facility;3. The primary source of energy used or to be used by the facility;4. The capacity of the facility for the production of power;5. The percentage of ownership which will be held in the facility by any electric utility or any holding company of a public utility;6. Proof that the owner or operator of the facility controls or will obtain control of the site for the facility;7. The efficiency of the generation of electricity of the facility; and8. If the facility is a cogeneration facility, the total efficiency of the generation of electricity and the use of waste energy of the facility.Nev. Admin. Code § 704.8781
Pub. Service Comm'n, Gen. Order 32 § 3.4, eff. 8-21-81-NAC A 3-27-92-Substituted in revision for NAC 704.710