GENERAL PROVISIONS
- Section 535.010 - Definitions
- Section 535.015 - "Alters" or "alteration" defined
- Section 535.020 - "Applicant" defined
- Section 535.025 - "Application for approval of plans for a dam" defined
- Section 535.027 - "Breach" defined
- Section 535.030 - "Capacity" defined
- Section 535.035 - "Closure" defined
- Section 535.040 - "Dam" defined
- Section 535.045 - "Decommission" defined
- Section 535.047 - "Failure of the dam" defined
- Section 535.050 - "Impounding" defined
- Section 535.055 - "Inflow design flood" defined
- Section 535.057 - "Lifeline" defined
- Section 535.060 - "Maximum conservation elevation" defined
- Section 535.065 - "Maximum credible earthquake" defined
- Section 535.070 - "Operator" defined
- Section 535.075 - "Owner" defined
- Section 535.080 - "Probable maximum flood" defined
- Section 535.085 - "Professional engineer" defined
- Section 535.090 - "State Engineer" defined
- Section 535.095 - "Water" defined
- Section 535.100 - "Water right" defined
- Section 535.110 - Expression of "elevation
- Section 535.120 - Height, crest and toe of dam
- Section 535.130 - Determination of size of dam
- Section 535.140 - Hazard classifications