Current through November 8, 2024
Section 535.350 - Assessment of fee for approved storage1. The State Engineer will, not later than December 31 of each year, assess each private, nonagricultural dam that is operated pursuant to an approval to impound, including a temporary approval to impound, the fee for approved storage required by NRS NRS 533.435.2. Except as otherwise provided in subsection 3, the State Engineer will use the approved capacity stated in the approval to impound, including a temporary approval to impound, in effect as of December 31 of the fiscal year of the assessment as the approved storage capacity subject to the fee.3. For a flood control detention basin, the State Engineer will use, except as otherwise provided in this subsection, the capacity to the spillway invert elevation in effect as of December 31 of the fiscal year of the assessment as the storage capacity subject to the fee. If a flood control detention basin lacks a spillway, the State Engineer will use the capacity relative to the inflow design flood in effect as of December 31 of the fiscal year of the assessment as the storage capacity subject to the fee.4. The fee is due and payable upon receipt of the assessment.5. As used in this section, "flood control detention basin" means a basin behind a dam which normally does not contain any impounded water and has an ungated outlet structure for the controlled release of water that is impounded during or after a flood to prevent erosion or downstream flooding.Nev. Admin. Code § 535.350
Added to NAC by St. Engineer by R124-02, eff. 5-30-2003; A by R054-14, eff. 10/24/2014