Current through October 11, 2024
Section 449.Sec. 6.2 - NEW1. Except as otherwise provided in subsection 2, before any construction of a new facility for hospice care or remodeling of an existing facility for hospice care commences, the facility must submit two complete sets of the building plans for the construction or remodeling, as applicable, to: (a) The entity designated by the Division to review such plans in the manner prescribed by NAC 449.0115, regardless of whether the facility is applying for a license or the renewal of a license. The review by that entity is only advisory, and approval by that entity does not constitute the approval of the construction or remodeling by the Bureau.(b) The Division. The facility shall not commence the construction or remodeling, as applicable, until the plans have been approved by the Division.2. The provisions of subsection 1 do not apply to the remodeling of an existing facility for hospice care if the remodeling is limited to refurbishing an area within the facility including, without limitation, painting the area, replacing flooring in the area, repairing windows in the area or replacing window and wall coverings in the area.3. The Division shall not issue a license to operate a newly constructed facility for hospice care until the Bureau has approved the construction. The Bureau shall not approve the construction without conducting a survey at the site of the facility. Such a survey must occur after the construction has been completed.Nev. Admin. Code § 449.Sec. 6.2
Added to NAC by Bd. of Health by R048-22A, eff. 12/29/2022