Section 449.99718 - Design, construction, equipment and maintenance1. A recovery center must be designed, constructed, equipped and maintained in a manner that protects the health and safety of the patients and personnel of the recovery center and members of the general public.2. A recovery center shall comply with all applicable:(a) Federal and state laws;(b) Local ordinances, including, without limitation, zoning ordinances; and(c) Life safety, environmental, health, fire and local building codes, related to the construction and maintenance of the recovery center. If there is a difference between state and local requirements, the more stringent requirements apply. 3. Except as otherwise provided in this section:(a) Each recovery center shall comply with the provisions of NFPA 101: Life Safety Code, as adopted by reference pursuant to NAC 449.0105.(b) Any new construction, remodeling or change in use of a recovery center must comply with the applicable provisions of the guidelines adopted by reference in paragraphs (c), (d) and (e) of subsection 1 of NAC 449.0105, unless the remodeling is limited to refurbishing an area within the recovery center, including, without limitation, painting the area, replacing the flooring, repairing windows or replacing window and wall coverings.4. A recovery center shall be deemed to be in compliance with the provisions of subsection 3 if: (a) The recovery center: (1) Was licensed as a facility for intermediate care pursuant to NRS 449.040 to 449.094, inclusive, before September 21, 2017;(2) Is seeking to change its operation as an intermediate care facility to a recovery center;(3) Does not change the use of the physical space in the recovery center; and(4) Does not have any deficiencies in the construction of the recovery center that are likely to cause serious injury, harm or impairment to the health and welfare of the public; or(b) Before September 21, 2017, the recovery center initially applied for licensure as an intermediate care facility pursuant to NRS 449.040 to 449.094, inclusive, and: (1) The recovery center submitted building plans to the Division in the manner set forth in NAC 449.0115;(2) The Division determines that the plans comply with the standards for construction of intermediate care facilities, which are set forth in NAC 449.685 to 449.728, inclusive;(3) Construction of the recovery center has commenced;(4) The center is constructed in accordance with such standards; and(5) There are no deficiencies in the construction of the recovery center that are likely to cause serious injury, harm or impairment to the health and welfare of the public.5. A recovery center shall submit building plans for new construction or remodeling to the entity designated to review such plans by the Division pursuant to NAC 449.0115. The entity's review of those plans is advisory only and does not constitute approval for the licensing of the recovery center. Before the construction or remodeling may begin, the plans for the construction or remodeling must be approved by the Division. The Division shall not approve a recovery center for licensure until all construction or remodeling has been completed and a survey is conducted at the site of the recovery center.Nev. Admin. Code § 449.99718
Added to NAC by Bd. of Health by R121-16A, eff. 9/21/2017; A by R016-20A, eff. 11/2/2020; A by R048-22A, eff. 12/29/2022NRS 439.200, 449.0302, 449.0303