Current through October 11, 2024
Section 445B.2915 - Informal review of proposed new major source or proposed modification of existing major source1. An owner or operator of a proposed new major source or an existing major source for which the owner or operator proposes a modification may, before the owner or operator submits an application for an operating permit or an operating permit to construct for the proposed new major source or for the modification of the existing major source, submit a written request to the Director for an informal review of the proposed new major source or modification of the existing major source. In conducting the informal review, the Director may provide advice or other assistance to the owner or operator concerning the preparation of a draft application for the operating permit or operating permit to construct. 2. A written request for an informal review submitted pursuant to subsection 1 must include:(a) A draft application for an operating permit or operating permit to construct for the proposed major source or modification of the existing major source; and(b) Any other information concerning the proposed new major source or modification of the existing major source required by the Director.Nev. Admin. Code § 445B.2915
Added to NAC by Environmental Comm'n by R154-06, 11-13-2006, eff. 1-1-2007; A by R046-19A, eff. 1/1/2020