Section 445B.33637 - Operating permit to construct for approval of plantwide applicability limitation: Application1. In addition to the requirements set forth in subsection 1 of NAC 445B.297, an application for a Class I operating permit to construct for the approval of a plantwide applicability limitation for a major stationary source must contain: (a) All the information required pursuant to 40 C.F.R. § 52.21(aa)(3) and all the information necessary to establish the plantwide applicability limitation in accordance with the requirements of 40 C.F.R. § 52.21(aa)(4);(b) A description of each pollutant for which the owner or operator is requesting a plantwide applicability limitation;(c) For each pollutant described in paragraph (b), the proposed plantwide applicability limitation for the entire major stationary source;(d) A monitoring plan that will be used to make an accurate determination of the plantwide emissions subject to the plantwide applicability limitation as specified in 40 C.F.R. § 52.21(aa)(12). The monitoring plan must identify, without limitation: (1) The monitoring approach proposed for each emission unit;(2) The minimum performance requirements of each such approach;(3) The basis for any emissions factors proposed; and(4) Any emission unit for which the owner or operator cannot demonstrate a correlation between the monitored parameters and the plantwide applicability limitation at all operating points;(e) If the owner or operator cannot demonstrate a correlation between the monitored parameters and the plantwide applicability limitation at all operating points as identified in paragraph (d) and the owner or operator requests to establish default values for determining compliance with the plantwide applicability limitation, any proposed default values to be used for determining compliance with the plantwide applicability limitation based on the highest potential emissions potentially operated for each emission unit;(f) A description of the calculation procedures that the source will use to convert monitored data into monthly emissions on a 12-month rolling period;(g) A description of any emission units that were permanently shut down after the baseline actual emissions period and the associated emissions;(h) A description of any emission units for which construction began after the baseline actual emissions period and the associated emissions; and(i) Any other requirements or information that the Director determines is necessary to implement and enforce the plantwide applicability limitation.2. An application for a Class I operating permit to construct to allow a plantwide applicability limitation to expire and not be renewed must contain:(a) A description of the proposed distribution of the emissions allowed by the plantwide applicability limitation for each emission unit or group of emission units at the major stationary source; and(b) A description of the proposed methods for complying with the distribution of the allowable emissions provided in paragraph (a).3. In addition to the information required pursuant to subsection 1, an application for a Class I operating permit to construct for the renewal of a plantwide applicability limitation must contain the information required pursuant to 40 C.F.R. § 52.21(aa)(10) for each plantwide applicability limitation pollutant.4. In addition to the information required pursuant to subsection 1, an application for a Class I operating permit to construct for increasing a plantwide applicability limitation must contain all the information required pursuant to 40 C.F.R. § 52.21(aa)(11).Nev. Admin. Code § 445B.33637
Added to NAC by Environmental Comm'n by R125-04, eff. 9-24-2004