Construction, Operation, Monitoring and Abandonment
- Section 445A.905 - Construction prohibited without permit
- Section 445A.906 - Compliance with permit; minimization or correction of adverse impact on environment
- Section 445A.907 - Power of Director to suspend or halt construction or operation
- Section 445A.908 - Location and construction of well
- Section 445A.909 - Submission and contents of notice of completion; approval or denial of permission to initiate injection
- Section 445A.910 - Factors for determining logging and testing requirements for Class II wells
- Section 445A.911 - Limitations on location and pressure of injection; authorizing fracturing in zone for injection
- Section 445A.912 - Analysis of injected fluid
- Section 445A.913 - Frequency of monitoring
- Section 445A.914 - Placement of wells for monitoring Class III wells
- Section 445A.915 - Analysis of wells for monitoring Class III wells
- Section 445A.916 - Tests for mechanical integrity: Frequency
- Section 445A.917 - Tests for mechanical integrity: Methods for evaluating absence of leaks
- Section 445A.918 - Tests for mechanical integrity: Methods for determining absence of movement of fluid
- Section 445A.919 - Tests for mechanical integrity: Alternative methods
- Section 445A.920 - Loss of or failure to demonstrate mechanical integrity
- Section 445A.921 - Filing reports from monitoring and results of periodic tests
- Section 445A.922 - Retention of records from monitoring
- Section 445A.923 - Plugging and abandonment: Plan; notice; procedure; certification
- Section 445A.924 - When well is deemed abandoned
- Section 445A.925 - Plugging of well determined to be abandoned