"Direct costs" means those costs which are readily identifiable with a specific job or work order, including wages, materials and equipment.
Nev. Admin. Code § 408.097
NRS 408.215
"Direct costs" means those costs which are readily identifiable with a specific job or work order, including wages, materials and equipment.
Nev. Admin. Code § 408.097
NRS 408.215