Nev. Admin. Code § 322.200

Current through November 8, 2024
Section 322.200 - Circumstances under which authorization is required; procedure for authorization on emergency basis
1. An authorization is required for the construction or placement of a pier, breakwater, mooring buoy, water intake line or other structure associated with a navigable body of water of this State and for the repair, reconstruction or alteration of such a structure if the repair, reconstruction or alteration would increase the size or change the location of the structure.
2. If an unforeseen combination of circumstances calls for the immediate action of the State Land Registrar regarding the construction or alteration of a structure described in subsection 1, the State Land Registrar will consider the matter on an emergency basis. The construction or alteration of such a structure may be performed upon verbal consent from the State Land Registrar, to be followed by written consent of the State Land Registrar. An application for an authorization and the appropriate fee must be submitted to the State Land Registrar within 30 days after the date of receipt of the verbal consent.

Nev. Admin. Code § 322.200

Added to NAC by St. Land Registrar by R135-13, eff. 10/24/2014

NRS 322.100, 322.170; NAC 445A.044