267 Neb. Admin. Code, ch. 7, § 011

Current through September 17, 2024
Section 267-7-011 - STRATIGRAPHY TEST HOLES

(This language references, TITLE 267 NEBRASKA OIL AND GAS CONSERVATION COMMISSION)

All stratigraphic test holes must be drilled as per the rules contained in Chapter 3, Sections 003, 004, 006, 007 and Section 012, General Drilling Rules.

267 Neb. Admin. Code, ch. 7, § 011

Adopted effective 7/27/2022