* Complete enclosure of all wells, tanks/pits and wellhead assemblies within suitable fencing; and/or
* All gates and other entry points shall be locked when the facility is unattended; and/or
* Provide tamper-proof seals or locks for the "master" valve on each well; and/or
* Install locking caps on all valves and connections on holding tanks and headers.
The following pressure or monitoring test must be performed on all new and existing enhanced recovery injection wells and disposal wells to periodically establish the mechanical integrity of the casing, and tubing and packer, if used.
267 Neb. Admin. Code, ch. 4, § 006