Within thirty (30) days following the completion or re-completion of each well producing oil and gas and thereafter as the Director may require the operator of such well shall make a gas-oil ratio test of such well; and the results of such test shall be reported to the Commission within twenty (20) days after the test is made. Certain wells may be excepted from this rule by the Director upon written request.
267 Neb. Admin. Code, ch. 3, § 027