An INACTIVE WELL is classified as SHUT-IN when the completion interval is open to the tubing or to the casing. An inactive well is classified as TEMPORARILY ABANDONED when the completion interval is isolated.
267 Neb. Admin. Code, ch. 1, § 020
An INACTIVE WELL is classified as SHUT-IN when the completion interval is open to the tubing or to the casing. An inactive well is classified as TEMPORARILY ABANDONED when the completion interval is isolated.
267 Neb. Admin. Code, ch. 1, § 020