Current through September 17, 2024
All repairs and alterations must comply with the rules as defined in 229 NAC 15.
A. All welded repairs to jurisdictional boilers and pressure vessels shall be performed by an organization holding the applicable "R" stamp issued by the National Board, except that in the case of pressure vessels installed at an API-510 owner-user facility, the repair may be performed by a repair organization as defined in section 3.16 of API-510. All repairs require prior notification and approval of a commissioned inspector. The use of pre-approved routine repair procedures shall be handled as described in 229 NAC 15. All repairs shall conform to the edition of the NBIC or API-510 as required by 229 NAC 02.B. The organization performing the repair or alteration shall be responsible for preparation, certification and distribution of the appropriate NBIC form or its equivalent under API-510. This form shall be filed with the Chief Boiler Inspector and with the National Board, if so required.229 Neb. Admin. Code, ch. 4, § 007
Amended effective 8/7/2016.