Effective January 1, 2006 the installation of boilers in new buildings, when there is a structural renovation of over 50% of an existing boiler room, or replacement of equipment in the room, shall meet the installation requirements outlined in Part 1 of the National Board Inspection Code. If the new installation cannot meet the requirements outlined in the NBIC, the chief inspector shall be notified prior to the installation of a new unit to request a variance from the requirements. The request shall detail the problem on what conditions cannot be met and any drawings or other documentation outlining the conditions shall be provided so that a solution to the conditions can be made.
229 Neb. Admin. Code, ch. 2, § 014