197 Neb. Admin. Code, ch. 6, § 001

Current through September 17, 2024
Section 197-6-001

The following requirements are applicable to owners who hire contract operators to operate their wastewater treatment facility. The owner of a wastewater treatment facility will:

001.01 notify the department within 30 days of hiring a contract operator; and
001.02 provide the department with a copy of the contract or other information detailing the contract operator's responsibilities and the owner's responsibilities.

197 Neb. Admin. Code, ch. 6, § 001

Repealed effective 12/10/2019
Amended effective 4/1/2020