The owner or operator of a solid waste processing facility requiring a permit, shall have a detailed written estimate, in current dollars, of the cost of hiring a third party to close the facility and properly dispose of all materials or wastes left at the site. This estimate shall be updated at the time of permit renewal, and shall include the cost of disposing of the most accumulated waste or materials that would ever be stored at the facility any one time.
132 Neb. Admin. Code, ch. 8, § 003