Current through September 17, 2024
Section 132-6-006 - Required Maps and DrawingsThe permit application for a solid waste processing facility shall include the following maps. When a structure described in 006 is not present at the site, a notation shall be made on the required map or drawing.
006.01 Maps of the site, drawn to scale, indicating the location of:006.01A Ground water monitoring wells and gas monitoring locations, if required;006.01B Points of entrance to and exit from the facility and to and from the operating area of the facility;006.01C Loading, dumping and any temporary storage areas;006.01D Interior roads and ramps;006.01E Devices for controlling litter;006.01F Devices for controlling unauthorized access to the facility site;006.01G Drainage facilities, structures, walls, cribbing, surface protection devices, and any other devices as are necessary to comply with applicable water quality standards;006.01H Fire protection facilities;006.01I Utilities to service the site;006.01J Gas and oil wells;006.01K High tension power lines; and006.01L Fuel transmission pipelines.006.02 Maps of the area within one-quarter mile of the boundaries of the site, drawn to scale, showing the location of: 006.02A Waterways and surface drains;006.02B Borings, wells, springs, and their surface elevations, and depths and elevations of water levels;006.02C Field tile drains; and006.02D Underground and surface mines, elevations of mine pools, and mine pool discharges.132 Neb. Admin. Code, ch. 6, § 006
Amended effective 5/17/2016.