130 Neb. Admin. Code, ch. 13, § 003

Current through September 17, 2024
Section 130-13-003

An applicant may supply additional information to the Department for reconsideration of the ground water monitoring requirement. The information shall be specific to the site and may include, but is not limited to, the following:

003.01 Geologic log of on-site test hole or water well, extending at least to ground water, with adequate detail concerning the sediments and/or rocks drilled through; and
003.02 Static water level in an existing on-site water well or in a new on-site test hole or water well, measured after water level has had time to stabilize, usually at least 24 hours after drilling.

130 Neb. Admin. Code, ch. 13, § 003