Current through September 17, 2024
All permittees and all recipients of construction approvals are required to have routine inspections conducted of the production area, irrigation distribution system, and land application areas as follows:
001.01 Weekly inspections at the production area of all storm water diversion devices, runoff diversion structures, and devices channeling contaminated storm water to the facilities;001.02 Daily inspection at the production area of water lines, including drinking water or cooling water lines;001.03 Daily monitoring and recording of any precipitation events;001.04 Weekly inspections at the production area of the manure, litter, and process wastewater impoundments. An inspection record shall note the level in liquid impoundments as indicated by the depth marker;001.05 Inspection prior to each operation of the irrigation distribution system and the water source protection equipment identified in Chapter 10 to ensure that the system and equipment operate as intended. The system shall be monitored while in use to insure the system operates as intended; and001.06 Inspection at least once a year to determine the sludge and sediment accumulation level in liquid impoundments.001.07 Maintain records of the above described inspections at the operation for a period of five years.130 Neb. Admin. Code, ch. 12, § 001