129 Neb. Admin. Code, ch. 3, § 006

Current through September 17, 2024
Section 129-3-006 - Permit Content

Each construction permit will include requirements applicable to the source and any additional requirements which the Director deems appropriate, including, but not limited to, the following:

006.01 Emissions limitations and standards, which are at least as stringent as any applicable requirement or other requirements contained in the SIP.
006.02 Compliance certification, testing, monitoring, reporting, and recordkeeping.

129 Neb. Admin. Code, ch. 3, § 006

Adopted effective 9/28/2022