EXAMPLE
Total tonnage mined_________________________ | ||
________________ oz. gold | @$________________ per oz. | $ ____________ |
________________ oz. silver | @$________________ per oz. | $ ___________ |
________________ lb. lead | @$________________ per lb. | $ ___________ |
________________ lb. copper | @$________________ per lb. | $ ___________ |
________________ tons | @$________________ per ton | $ ___________ |
________________ carats | @$________________ per carat | $ ___________ |
Total Value________________ |
Mont. Admin. r. 42.25.1102
Sec. 15-23-108, MCA; IMP, Sec. 15-23-502, MCA;