Current through Register Vol. 23, December 6, 2024
Rule 38.5.1908 - INFORMATION TO BE PROVIDED TO THE COMMISSION(1) Pursuant to initial contact with a potential qualifying facility, each utility shall provide the Commission with one electronic copy of the utility's initial written response.(2) No later than July 1 of each even-numbered year, each utility shall file with the Commission the following cost data:(a) the estimated avoided cost of energy as required by 18 CFR 292.302(b)(1);(b) the electric utility's latest resource plan, including any supplements, as required by 18 CFR 292.302(b)(2); and(c) the estimated capacity costs as required by 18 CFR 292.302(b)(3). These costs shall represent the avoidable resources in the utility's resource plan.Mont. Admin. r. 38.5.1908
NEW, 1981 MAR p. 459, Eff. 5/15/81; AMD, 2022 MAR p. 1919, Eff. 9/24/2022AUTH: 69-3-103, MCA; IMP: 69-3-102, MCA