Mo. Code Regs. tit. 10 § 45-8.030

Current through Register Vol. 49, No. 23, December 2, 2024
Section 10 CSR 45-8.030 - Metallic Minerals Waste Management Structures

PURPOSE: This rule amendment follows the review conducted pursuant to Executive Order 17-03. The amendment proposes to remove language that repeats statute or is obsolete.

(1) For dams located in metallic minerals waste management areas that are constructed after the effective date of this regulation and are less than thirty-five feet (35') in height, the operator shall certify using standards that are currently acceptable and available to the engineering profession that the structures meet the requirements for spillway capacity, slope stability, correction of observable defects, maintenance, and inspection in order to ensure the continued integrity of the structure.
(2) For dams located in metallic minerals waste management areas that were constructed before the effective date of this regulation and are less than thirty-five feet (35') in height, the operator shall certify using standards that are currently acceptable and available to the engineering profession that the structures meet the requirements for spillway capacity, correction of observable defects, and maintenance and inspection.
(3) Sloped faces of slag waste piles or other waste management control structures shall be maintained according to the lines and gradients shown on the approved permit application. Any slope failures, as evidenced by scarp formation, sloughing, bulging, or other indications, shall be reported to the director in writing within ten (10) days of the time when the failure is first noticed. Upon review what corrective action is to be taken. Corrective action may include repair and stabilization of the failed area.
(4) Sloped faces that experience erosion shall be repaired by the operator on an on-going basis. The operator shall keep a record of all these repairs and make these records available to the director upon request. No repairs shall be made that would result in significant deviances from the lines and grades shown on the approved permit application without written approval of these repairs by the director. Areas that experience recurring erosion may require special erosion control measures, such as application of revetment materials, regrading and so forth. The director and operator will determine the need for these measures during the review of the closure plan. The operator shall prepare plans and specifications for measures in accordance with practices reputable and appropriate in the engineering, geologic, and construction professions. A copy of these plans and specifications will be provided to the director for review. The operator shall not begin construction of erosion control measures without written approval of that work from the director.
(5) The operator shall provide a judgment of the effect of subsidence and earthquake loads on the long-term stability and integrity of all tailings dams, slag piles, and other waste management control structures located within the boundary of the waste management area. The judgment shall be based upon engineering analysis and experience in accordance with practices reputable and in current use in the engineering and geologic professions. The operator and director shall determine the need for remedial measures to counteract the effects of potential subsidence.

10 CSR 45-8.030

AUTHORITY: sections 444.362 and 444.380, RSMo Supp. 1989.* Original rule filed Oct. 2, 1990, effective 4/29/1991.
Amended by Missouri Register October 15, 2018/Volume 43, Number 20, effective 11/30/2018

*Original authority: 444.362, RSMo 1989 and 444.380, RSMo 1989.