PURPOSE: This rule defines air con taminant sources which are required to obtain operating permits and establishes procedures for obtaining and complying with operating permits; it does not establish any air quality standards or guidelines.
PUBLISHER'S NOTE: The secretary of state has determined that the publication of the entire text of the material which is incorporated by reference as a portion of this rule would be unduly cumbersome or expensive. This material as incorporated by reference in this rule shall be maintained by the agency at its headquarters and shall be made available to the public for inspection and copying at no more than the actual cost of reproduction. This note applies only to the reference material. The entire text of the rule is printed here.
Total filing fee = (base fee) + (total additional complexity fee)
Where:
Total filing fee = amount due upon filing of operating permit application, not to exceed six thousand dollars ($6,000) (regardless of calculated amount).
Base fee = determine using Table 1 Total additional complexity fee = determine using Table 2
Table 1: Base fee
Number of Emission Units | Base Fee |
0 to30 | $750 |
31 to 60 | $1,000 |
61 to 90 | $1,250 |
Over 91 | $1,500 |
Table 2: Worksheet for installation additional complexity fee calculations
Complexity Category | Calculation | ||||
Number per installation | X | Fee | = | Additional complexity fee subtotal | |
New Source Performance Standard (NSPS) | _______ | X | $1,000 | = | ________ |
Maximum Achievable Control Technology (MACT) | _______ | X | $1,500 | = | ________ |
National Emissions Standards for Hazardous Air Pollutants (NESHAP) | _______ | X | $1,500 | = | ________ |
Compliance Assurance Monitoring (CAM) | _______ | X | $1,000 | = | ________ |
Confidentiality Request | _______ | X | $500 | = | ________ |
Acid Rain | _______ | X | $500 | = | ________ |
Total additional complexity fee | $ |
Total filing fee = (base fee) + (total additional complexity fee)
Where:
Total filing fee = amount due upon filing of operating permit application, not to exceed six thousand dollars ($6,000) (regardless of calculated amount).
Base fee = determine using Table 1
Total additional complexity fee = determine using Table 2
Table 1: Base fee
Number of Emission Units | Base Fee |
0 to30 | $750 |
31 to 60 | $1,000 |
61 to 90 | $1,250 |
Over 91 | $1,500 |
Table 2: Worksheet for installation additional complexity fee calculations
Complexity | Calculation | ||||
Category | Number per installation | X | Fee | = | Additional complexity fee subtotal |
New Source Performance Standard (NSPS) | _______ | X | $1,000 | = | _______ |
Maximum Achievable Control Technology (MACT) | _______ | X | $1,500 | = | _______ |
National Emissions Standards for Hazardous Air Pollutants (NESHAP) | _______ | X | $1,500 | = | _______ |
Compliance Assurance Monitoring (CAM) | _______ | X | $1,000 | = | _______ |
Confidentiality Request | _______ | X | $500 | = | _______ |
Acid Rain | _______ | X | $500 | = | _______ |
Total additional compexity fee | $ |
10 CSR 10-6.065
*Original authority: 643.050, RSMo 1965, amended 1972, 1992, 1993, 1995, 2011.