Up to 8% of the grant amount may be used for design work, i.e., engineer or architect. Engineering and/or architectural costs above 8% must be paid from other funding sources.
6 Miss. Code. R. 4-12.17
Up to 8% of the grant amount may be used for design work, i.e., engineer or architect. Engineering and/or architectural costs above 8% must be paid from other funding sources.
6 Miss. Code. R. 4-12.17