Rule 6-3-5.40 - Evaluation Criteria for Qualification

Responses that receive 75% or more of the total points available will be designated as "Qualified" by the Division for the entire or remaining portion of the 2-year "Qualification Period. Criteria for the evaluation are listed below:

A. Financial Stability of the ESP (25 points)
i. Firm's corporate history and growth
ii. Financial soundness and stability of the ESP
iii. Completeness of ESP's financial statements and reports
iv. ESP's bonding capacity
B. Experience and Track Record (25 points)
i. Qualifications and experience of ESP's personnel, including employment background, educational background, professional/technical qualifications, and energy project experience of ESP's primary project team members
ii. Overall energy project experience and qualifications
iii. Quality of design, engineering, installation, and if applicable, maintenance, and repairs
iv. Reliability of equipment performance on past projects
v. Quality of Project History and Client Reference documentation for at least five (5) completed energy projects
vi. Quality and completeness of documentation of achieved energy savings from previous GESPC or SSCs
vii. Litigation history
viii. Reliability of equipment performance on past projects
C. Project Management (20 points)
i. Overall project management capability
ii. Ability to effectively manage project construction
iii. Quality of engineering and construction management resources
iv. Comprehensiveness of post-installation project monitoring, data collection, and verification of and reporting of savings for energy performance contracts or shared savings contracts
v. Ability to plan and complete all phases of the project on schedule
D. Technical Approach (25 points)
i. Quality of Response to 14a-14h of Technical Project Capabilities
ii. Quality of the sample investment grade energy audit, if applicable
iii. Technical approach to past projects
iv. Quality of sample Customer Savings Report, if applicable
v. Quality of sample Savings Measurement and Verification Plan, if applicable
vi. Quality of sample design documentation for installed ECMs
vii. Quality of sample Operations and Maintenance Manual, if applicable
viii. Quality of sample Commissioning Plan, if applicable
ix. Quality of Customer Training Plan, if applicable
E. Overall Quality (5 points)
i. Other factors determined by the Division to be relevant and appropriate and relate to the ability to perform the project.

6 Miss. Code. R. 3-5.40