Current through December 10, 2024
Rule 6-1-8.3 - Allowable CostsA. Construction costs (including reasonable and customary site work for buildings, right-of-ways, easements, etc.).B. Up to eight percent (8%) of the principal loan amount for design work, i.e., engineer or architect. Engineering and/or architectural costs above 8% will be paid from other funding sources.Miss. Code Ann. § 57-44-7 (Supp. 2008)