The District Permit Officer will contact the appropriate District Maintenance Engineer and District Construction Engineer, or their designee(s) to obtain their approval for the move. Information obtained from the house mover will be faxed to the adjacent District(s) as needed.
37 Miss. Code. R. § 1-7501-22001-303