After the County has completed the requirements and work outlined in Items 202 and 203 above and furnished the Commission with the Final Certificate and Conveyance (Form MND-200) and Certificate of Title (Form MND-082) to the right of way as shown on the plans along with the necessary drainage easements; the Commission will take over the section of road for construction and maintenance when funds become available for construction.
37 Miss. Code. R. § 1-7501-05001-204