Section 37-1-7501-03004-202The District Engineer may consider approval of applications from authorized applicants.
1. The District Engineer may reject any application which in his opinion could cause hazard to the traveling public or be detrimental to the condition of the highway rights-of-way.2. The design, materials and method(s) used for the seismic survey must be specified in writing and shall adhere to all safety guidelines set forth by the industry standard. It is noted that the applicant, by signing this permit, certifies that the design, materials and method(s) of operations are of the industry standard, where the industry standard is indicated.3. The District Engineer will have a visual inspection (unless otherwise deemed necessary) made prior to each survey and within 60 days after completion of each survey in order to determine if any damage has occurred to the highway facility.37 Miss. Code. R. § 1-7501-03004-202